Building Begins

February 1, 2021 9:15 pm Published by

After a fair bit of destruction. A lot of that seems to happen.

Taking away to old floor revealed a lot of rotten joists – due to close proximity of the (still) damp wall. They were also resting on some 1.5×2 steel angle which was just not up to what was needed for the future, and that was being held up with well rotted ‘rawl bolts’.

All that got taken down, binned and new steel I beams placed on proper heavy duty columns. The I beams are somewhat larger than needed, and could probaly be used to hold up something rather larger, but hey – its me. They would also act as load bearing for two rather large wooden beams, that would have further joists hung off them to make the loft void floor.

The following images should give some clue as to what all that means.

10438951_10202618812989812_4803614070572041077_n
10985335_10202302892932008_8462265312086904409_o
11169564_10202741270211166_1186369598014425071_o
Well, there’s the upright, now just get that full sized joist up on the top and balance it there.
11187160_10202741273091238_7286529134130618183_o
No, not there, on the top of that upright.
11187422_10202741273051237_6359271363086440781_o
There you go, now do the same for the front one…
11247606_10202744563053485_180706528353056499_o
Such impressive wall decoration and so much mess.
Now build that loo and get the stairs in.
11265313_10202759589869146_8126852757078149423_o
11121891_10202803233640213_4789492631710635778_o
Getting there.
10919418_10202836394429212_6756257304216087723_o
EE471989-0CFF-4C37-BAD8-EE687D405DA9
684DFAC1-FE6D-41A1-8B1B-05783A7FED85
BE36232F-F6DA-4AEF-8D65-9105CDFFB050
71A595D0-212A-44FD-BA62-FA3651988769
Sorted.

That being done, and access now available to the loft void, where work could begin on sorting this rather dirty, messy load of foundry dust out. Oh – deep joy.

12841349_10204131463485129_6508798866454246136_o
«
»