Quick Update.

February 5, 2021 8:30 pm Published by

Of where we were to where we are in February 2021- then and now pictures as an update in time.

10452948_10202302894132038_4430139602398585586_o
A while back…
AC9E4581-1256-462F-85BB-4C95338BB6C9
Now, from what will be DR3
99FD1A4B-4532-410C-9F90-908F6C7A0F63
Built in bass traps under stairs and picture traps on walls
81EB55CA-1DDF-48F8-AA46-A9AB2ABCD75B
Yet more bass traps above toilet (massive volume of rockwool.)
EEAB1876-90F7-4E98-90ED-F42B0F7AC3DD
Even built into the walls on the stairs to loft.
IMG_2510
Loft void then.
92AD34E7-9133-42BF-82EB-38A8363CA5F5
& now. Bit of difference.
39B6709E-890A-40DC-B298-DD3FB7C12E67
05084316-CB69-4B9A-BFE4-101FCC1F1BFB

Think that gives a clue as to how much actually needed to be done.

Next up, work on the workshop and warehouse floor..

930CC312-8C18-4EF6-8557-696762232FBD_1_201_a
A very real love/hate relationship with this thing.
«
»