2,000 Sq feet of concrete.

February 7, 2021 10:09 pm Published by

Is a fair bit of concrete. Some very old, some new but rubbish. All heavily ingrained with black foundry soot. Some covered sporadically with self levelling compound (that didn’t) and some with several layers of various grades of epoxy floor paint.

How to deal with that, get it reasonably flat, level, and where it was weak, made strong. How to get rid of what appeared to be occasional steel joists burnt off at floor level, lower or out altogether. Just how?

Lots of research later, after considering options as – do it all at once, get someone in. Impossible, where does the stock go and the cost was horrendous. Dig it all out in sections and start again. Price and time = nope. Diamond floor leveller, that may work, but expensive on wearable parts. Machine hire very expensive given how long it would be needed (months)

A floor scrabbler, Hmm Interesting toy. Does the job, can be had second hand, just messy. Oh boy are they messy. Dust lie you cannot believe, naughty, nasty hi silica concrete dust. Even with industrial extraction and air filters – it pervaded everywhere.

We needed to remove between 5 & 10mm of the top layer.

This exposed steels (everywhere) and so many weak areas, patched areas, channels, internal railway tracks for the molten steel. real aaaargh moments. Lots of them.

First, under an old section of racking, a small hollow area showed up. That got bigger and exposed a steel I beam, followed by another, and another. The entire hole, when finally emptied took nigh on 3 tons of concrete to fill.

Concrete. Is just concrete yeah? Nope. I researched how to make it A) strong, and B) flow correctly. Found all the grades I could and settled on 1:1:2 and then add super plasticiser. Thats Cement:Sand:10mm gravel by the way.

Superplasticiser is pretty amazing stuff actually, and comes in liquid or powder forms. Concrete gets stronger the less water you add, but without water, how does it flow instead of just being a pile of un responsive sand and stone? Add the superplasticiser at the set rate (250ml : mix in my case) and something most odd occurs.In the mixer it is close to a dry mix, that would be impossible to work. Add the gunk, and 10 – 30 seconds later, what water is already in there is foced out and the entire mix turns to a very thin almost soup consistency, that flows like water. But the mix does not segregate out to be stones and sand and water, which would be disaster.

Science lesson over – Super plasticised cement became one very, very useful tool to have at hand – from filling holes, to casting continuous padstones for steel lintels, the concrete physically flowing the entire lenght on a steel beam without any issue.

Once the decision was made to get a scrabbler, and the associated hardware, we could begin in stages. Thankfully stages worked.

Not just any old floor levelling compound went down, but proper industrial stuff that could withstand forklift traffic, heavy machines and workshop hardware without any strain.

Rockbond Industrial floor screed does just that job :-

Once dry, a very strong, clean finish was needed, again that can handle warehous traffic. For that we decided on Britannia Floor paints two pack system. Worked rather well, and looks pretty good I think.

Ill add some images here, and add more later with little more explanation, probably.

2A32B049-E065-4A31-B127-CF450D80CA9E_1_201_a
The notorious scrabbler – it did a fair bit of work, and was a good buy second hand.
80CE2987-8FBC-4DA2-ABF7-75A408B76729_1_201_a
Very heavy and heavy duty requiring 6mm trailing extension cable.
0B4072F0-95AE-4B6B-83DC-31FEA43C40DA_1_201_a
We got better at it the more we did.
3C6F03B8-734B-4D84-ADBE-A48A01746AD5_1_201_a
& Then the issues started to turn up – everywhere.
B31F2D07-019F-4E46-A2CE-E30BD20F04A3_1_201_a
They got bigger
3ECBE784-2989-450D-9B38-CFA614E78182_1_201_a
And bigger
426A1339-3CA6-4EF7-8A0D-6DEFC7A25CD6_1_201_a
Until they were fully exposed. It took a lot of concrete to fill that!
CCF8C80D-D82D-4D88-8CCA-F4D79C272DCF_1_201_a
Already visible are the next two issues.
499D7788-9D77-436F-BF0E-293EC2F2688B_1_201_a
After painting the entire hole with special adhesive to bind the concrete (SBR) filling could begin
C97DE42A-50DE-40BE-9C51-5ECE8664C4F7_1_201_a
One down, many (as yet unknown) to go.
5C6B3FDB-B0B4-4759-8852-5AFF34DFDBBB_1_201_a
Finally, a nice clear area free of obstruction ready to be screeded.
BCEE7BF2-66EA-4D29-994C-5D729C09A10F_1_201_a
Large cracks and voids pre filled with compound, painted with SBR dry, and its ready.

A9B390F7-606B-4B2F-B81F-CAC9C7289573
Allow to dry, but what’s that steel sticking out top left? looks problematic as it will be above the floor level.
3F227235-307E-40DC-8421-DE2E8242C68B_1_201_a
Does not look so bad. Always a very bad sign.
2AB00369-38FF-4421-8A8E-6CEA1DF60B78_1_201_a
Oh look, it gets bigger – someone burnt off the top of an I beam and left the rest in the concrete.
2BB224BA-B9CB-4584-9FBD-0BF54E5C5617_1_201_a
And it still will not come out – why??
0E47257E-9D05-4521-A156-7003B9186D07_1_201_a
Cut this lot off and it will be free.
4097B75B-BD82-4509-8FCA-576EC3761B10_1_201_a
Free?? In your dreams.
AF12F791-79CB-4351-AD20-D7E47CCE9A36_1_201_a
Maybe its fixed to this somehow?
7D809B21-1931-46D9-BE47-6505D215A556_1_201_a
Aapparently not so.
DE5BEA49-0553-4E3E-BA70-AA0DFCC8D11E_1_201_a
Oh look, there appears to be another I beam below this one? Really?
6550EB5A-ADD8-423B-98AE-C73454AF551A_1_201_a
Well of course, someone welded two I beams together and set them in concrete. Why wouldn’t you?
FE34AEDD-524D-483F-8B76-F4F4734F12AC_1_201_a
That was a lot of very frustrating work.
44C5C71C-3418-4F0A-81B1-673F53B77621_1_201_a
Just fill that one now..
373823C9-FA57-486D-8D60-9DF56A5812EB_1_201_a
It worked out ok in the end 🙂
«
»