I really wanted the doors fitted and working by now. To achieve this, I need the door casings to be fully correct and lined. To achieve that, I really need some floating floor in place. To achieve that, the new kitchen sink needs to be fitted, the old one taken away. To acheive that I need timber and worktops.
It was never going to happen really, was it.. Timber, while about the only thing not it super short supply at the moment, delivery could not happen for a week, along with the worktops. Plenty of other things to carry on with, while awaiting those deliveries.
Using what timber I had left, door casings took final shape, and the first bass traps for wall and front left corner began to take shape, along with the final sizes becoming apparent for the ceiling / wall box traps begining to be set in stone.
Couple of general use sockets set into place, and some actual wall now in final place!
Hopefully stuff begins to pick up speed again.