The Downstairs – Finished, Well Almost..

March 14, 2021 5:04 pm Published by

As I have mentioned before, this unit just likes being the way it is, and resists every single thing it can in making it into a nicer place, a warmer place, and somewhere nice to work in.

We needed a new downstairs toilet and wash area, the old being just a little too ‘workmanlike’ to have visitors use.

The main steel entrance door has seen way better days, and was not as secure as I would like, and the double doors for the warehouse area had gone through the ‘shrink and expand’ thing with rain, frost, direct sun, and whatever else could be thrown at them one too many times, and were failing badly.

The floor to the warehouse area had had its share of steels removed, but certain areas remained very hollow, turned out, the builder had found old pipes of whatever flavour in a gully. Filled with very bad concrete, and the entire gulley was just not stable enough to lay a new floor on. 10 minutes with the demolition hammer and I had a nice 14″ wide byt 12″ deep trench to fill with new concrete.

Four high density concrete block pillars needed to be built to support the new door frames, and a wall built to support the new ASHP (Air Source Heat Pump) HVAC heating and cooling appliance. So still plenty to plough on with before I could finally get upstairs.

That all got sorted, as images below, with now just one small area of floor paint to finish off.

There is always ‘something’..

IMG_0849
The foor looks so clean and shiny when unused..
IMG_0851
It doesn’t last long.
IMG_0914
IMG_0970
IMG_1053
IMG_1225
New toilet area.
IMG_1224
Toilet, washroom, new HVAC, wiring in disarray.
IMG_1226
Washroom area.
IMG_1250
Getting neater.
IMG_1265
IMG_1324
Finished and working.
IMG_1266
IMG_1267
First of 4 pillars and a wall.
IMG_1252
New entrance and wall with HVAC.
IMG_1256
IMG_1260
IMG_1703
Pillars complete, those doors need to come off and new ones fitted – all within 8 hours..
IMG_1704
Wont be a big job.
IMG_1706
Those black sacs are full of old warehouse floor.
IMG_1707
Well, thats the old doors done with.
IMG_1744
& new ones fitted – they were four man heavy.
IMG_1743
Somewhat more secure, draught free, and really stopped the noise getting in.
IMG_1476
Meanwhile, back to the floor.
IMG_1516
The begining of yet another trench to fill with concrete.
8E2ECED8-8B9C-4578-8279-FE06C6FB2474_1_201_a
And still the rest of the warehouse floor got finished.

I think the general idea for downstairs is now done – next up, get all those machines and stuff downstairs, fit them, and then we can begin making the new room, from soundproofing to acoustics to making bass traps and filling it with nice things 🙂

IMG_1294
Get this lot downstairs, renew bad floor areas, build a wall to the left, soundproof all three walls and then, well, the fun can begin..
«
»